SWRO desalination plant — Phase I and II

Chabahar

62,500 m³/day (Phase I, II & III) SWRO desalination plant

Chabahar, IranSWRO62,500 m³/day
Discuss a similar project
chabahar (40)
01/38

chabahar (40)

Technical details

Overview

After the successful construction and operation of Phase I, contracts for the second and third phases were won in separate tenders. Feed water is supplied from the Oman Sea via a direct intake system, pretreated through gravity sand filters, then directed to cartridge filters and SWRO units. Permeate enters the Chabahar and Konarak water distribution network.

Main components

Direct intake system and piping, gravity sand filters, filtered water pump station and reservoir tank, chemical dosing unit, cartridge filters, high pressure pumps, pressure vessels and membranes, storage tanks, CIP unit, permeate pumping station and pipeline.

Associated companies

Design and equipment by Axiom (Austria) and B2A (Austria). All other work carried out by NVCo.

Phase I

Contract awarded
2011
Duration to start up
10 months
Contract period
10 years from start up
Contractual capacity
15,000 m³/day
Final nominal capacity
17,500 m³/day

Phase II

Contract awarded
2013
Duration to start up
10 months
Contract period
10 years from start up
Contractual capacity
15,000 m³/day
Final nominal capacity
17,500 m³/day

Phase III

Contract awarded
2022
Duration to start up
24 months
Contract period
Up to 2038
Contractual capacity
20,000 m³/day
Final nominal capacity
22,500 m³/day